33 Tehama: Difference between revisions
m Bot: galleries syntax and minor changes |
BenjaminR44 (talk | contribs) No edit summary |
||
Line 4: | Line 4: | ||
| alternate_names = 33 Tehama Street |
| alternate_names = 33 Tehama Street |
||
| status = Under construction |
| status = Under construction |
||
| image = |
| image =33 Tehama Construction Incident.jpg |
||
⚫ | |||
| caption = |
|||
| location = 33 Tehama |
| location = 33 Tehama St.,<br>[[San Francisco]], [[California]] |
||
| coordinates = {{coord|37.7873|-122.3962|region:US-CA_type:landmark|display=title,inline}} |
| coordinates = {{coord|37.7873|-122.3962|region:US-CA_type:landmark|display=title,inline}} |
||
⚫ | |||
| start_date = 2015 |
| start_date = 2015 |
||
| completion_date = |
| completion_date = |
||
Line 27: | Line 26: | ||
| structural_engineer = |
| structural_engineer = |
||
| main_contractor = [[Lend Lease Group]] |
| main_contractor = [[Lend Lease Group]] |
||
⚫ | |||
| est_completion = 2017 |
| est_completion = 2017 |
||
| number_of_units = 403 |
| number_of_units = 403 |
||
Line 34: | Line 34: | ||
}} |
}} |
||
'''33 Tehama''' (formerly 41 Tehama) is a luxury residential apartment complex under construction in [[San Francisco]], [[California]]. |
'''33 Tehama''' (formerly 41 Tehama) is a luxury residential apartment complex under construction in [[San Francisco]], [[California]]. The building will be {{convert|380|ft}} tall, 35 stories, and contain 403 residential units.<ref name=hines>{{cite web|title=Construction Underway on Hines' 33 Tehama|url=https://www.hines.com/news/construction-underway-on-hines-41-tehama|date=Aug 20, 2015|publisher=Hines|accessdate=Jan 5, 2017}}</ref><ref name=":0">{{cite web|title=EXCLUSIVE: Hines and Invesco snap up Transbay site in S.F. for 418-unit highrise|url=http://www.bizjournals.com/sanfrancisco/blog/real-estate/2014/05/hines-invesco-transbay-41-tehama-arquitectonica-sf.html|date=May 19, 2014|first=Blanca|last=Torres|publisher=San Francisco Business Journal|accessdate=Jan 5, 2017}}</ref><ref>{{cite web|title=Construction Underway on 35-Story Apartment High-Rise in San Francisco|url=http://www.ctbuh.org/News/GlobalTallNews/tabid/4810/Article/3081/language/en-US/view.aspx|publisher=Council on Tall Buildings and Urban Habitat|date=Aug 4, 2015|accessdate=Jan 5, 2017}}</ref> |
||
Groundbreaking was in mid-2015, and construction is expected to finish in 2017. The building is part of the [[San Francisco Transbay development]] area around the new [[Transbay Transit Center]] site in the [[South of Market, San Francisco|South of Market]] neighborhood. |
Groundbreaking was in mid-2015, and construction is expected to finish in 2017. The building is part of the [[San Francisco Transbay development]] area around the new [[Transbay Transit Center]] site in the [[South of Market, San Francisco|South of Market]] neighborhood. |
||
Line 60: | Line 60: | ||
"Forming Concepts Inc. Vice President of Engineering Paul Elvin PE has been on the job at 33 Tehama. He has inspected the formwork on the project. Mr. Elvin states with the additional [[shoring]] added and the securing of braces, the forms are now in a stable condition."<ref>{{Cite web|url=http://www.mysanantonio.com/business/real-estate/article/Construction-resumes-at-Hines-San-Francisco-10938344.php|title=Construction resumes after mishap at Hines' San Francisco tower|last=Sarnoff|first=Nancy|date=Feb 16, 2017|website=|archive-url=|archive-date=|dead-url=|access-date=Feb 21, 2017}}</ref> |
"Forming Concepts Inc. Vice President of Engineering Paul Elvin PE has been on the job at 33 Tehama. He has inspected the formwork on the project. Mr. Elvin states with the additional [[shoring]] added and the securing of braces, the forms are now in a stable condition."<ref>{{Cite web|url=http://www.mysanantonio.com/business/real-estate/article/Construction-resumes-at-Hines-San-Francisco-10938344.php|title=Construction resumes after mishap at Hines' San Francisco tower|last=Sarnoff|first=Nancy|date=Feb 16, 2017|website=|archive-url=|archive-date=|dead-url=|access-date=Feb 21, 2017}}</ref> |
||
⚫ | |||
==Gallery== |
==Gallery== |
||
<gallery> |
<gallery> |
Revision as of 18:11, 3 September 2017
33 Tehama | |
---|---|
Former names | 41 Tehama Street |
Alternative names | 33 Tehama Street |
General information | |
Status | Under construction |
Type | Residential apartments |
Location | 33 Tehama St., San Francisco, California |
Coordinates | 37°47′14″N 122°23′46″W / 37.7873°N 122.3962°W |
Construction started | 2015 |
Estimated completion | 2017 |
Owner | Hines Interests Limited Partnership |
Height | |
Architectural | 380 ft (120 m) |
Roof | 360 ft (110 m) |
Technical details | |
Floor count | 35 |
Design and construction | |
Architect(s) | Arquitectonica |
Developer | Hines Interests Limited Partnership Invesco |
Main contractor | Lend Lease Group |
Other information | |
Number of units | 403 |
Website | |
33tehama | |
References | |
[1][2][3][4] |
33 Tehama (formerly 41 Tehama) is a luxury residential apartment complex under construction in San Francisco, California. The building will be 380 feet (120 m) tall, 35 stories, and contain 403 residential units.[5][6][7]
Groundbreaking was in mid-2015, and construction is expected to finish in 2017. The building is part of the San Francisco Transbay development area around the new Transbay Transit Center site in the South of Market neighborhood.
Apartments
33 Tehama consists of one-bedroom and two-bedroom apartments, as well as penthouses. Amenities include a fitness center, club room, outdoor rooftop terrace, and a ground floor art installation designed by Yayoi Kusama.[8]
Retail
33 Tehama offers 700 square feet of ground floor retail space.[6]
Construction incident
On February 15, 2017, a construction malfunction of the climbing formwork occurred, prompting precautionary evacuations of neighboring buildings. The developer's first official statement reads:
"This afternoon, an incident occurred at the 33 Tehama site between levels 35 and 36 where an interior forming system had a partial hydraulic failure while being raised to the next level. The interior forming system and the concrete placement arm have been secured and are being evaluated by engineers to bring it back to level.
"No injuries and or damage has been reported.
"Please note the boom is located in the center of the top level. This is NOT the crane attached to the outside of the building. Previous reports that a 2,000 pound slab of concrete is in danger of falling are also false.
33 Tehama is being developed by Hines and Invesco Real Estate. Lendlease is the general contractor."[9][10][11][12]
A second statement was released on February 17, 2017:
"When a Hydro jack failed causing the tilt, Lendlease, the project's general contractor, immediately secured all equipment and materials. The interior forming system and the concrete placement arm were secured and were evaluated by engineers to bring it back to level.
"Forming Concepts Inc. Vice President of Engineering Paul Elvin PE has been on the job at 33 Tehama. He has inspected the formwork on the project. Mr. Elvin states with the additional shoring added and the securing of braces, the forms are now in a stable condition."[13]
Gallery
-
Photo of the excavation for 41 Tehama Street, taken 18 December 2015.
References
- ^ 33 Tehama at Emporis
- ^ "33 Tehama". SkyscraperPage.
- ^ "33 Tehama Street". Lend Lease. Retrieved Jan 10, 2017.
- ^ "33 Tehama". BuzzBuzzHome. Retrieved Feb 16, 2017.
- ^ "Construction Underway on Hines' 33 Tehama". Hines. Aug 20, 2015. Retrieved Jan 5, 2017.
- ^ a b Torres, Blanca (May 19, 2014). "EXCLUSIVE: Hines and Invesco snap up Transbay site in S.F. for 418-unit highrise". San Francisco Business Journal. Retrieved Jan 5, 2017.
- ^ "Construction Underway on 35-Story Apartment High-Rise in San Francisco". Council on Tall Buildings and Urban Habitat. Aug 4, 2015. Retrieved Jan 5, 2017.
- ^ "33 Tehama". The Mark Company. Retrieved June 2, 2017.
{{cite web}}
: Cite has empty unknown parameter:|dead-url=
(help) - ^ "Evacuations Lifted, Streets Reopen Around SoMa Construction Site". Feb 15, 2017.
- ^ "Building evacuated in San Francisco's South of Market neighborhood due to loose 2,000-pound concrete slab". Feb 15, 2017.
- ^ "SoMa skyscraper construction failure forcing evacuation of over a dozen buildings". Feb 15, 2017.
- ^ "UPDATE: Evacuations underway at 10 buildings near construction site in SoMa". Feb 15, 2017.
- ^ Sarnoff, Nancy (Feb 16, 2017). "Construction resumes after mishap at Hines' San Francisco tower". Retrieved Feb 21, 2017.
{{cite web}}
: Cite has empty unknown parameter:|dead-url=
(help)