Jump to content

Manhattan Transfer station: Difference between revisions

Coordinates: 40°44′31″N 74°08′38″W / 40.742°N 74.144°W / 40.742; -74.144 (Manhattan Transfer)
From Wikipedia, the free encyclopedia
Content deleted Content added
Monkbot (talk | contribs)
m Decline: Task 16: replaced (0×) / removed (2×) deprecated |dead-url= and |deadurl= with |url-status=;
Line 85: Line 85:
Until 1910 none of the railroads that crossed New Jersey to reach New York City crossed the [[North River (Hudson River)|Hudson River]], but had [[Railroad terminals serving New York City|terminals]] on the [[Hudson Waterfront]], where passengers boarded [[List of ferries across the Hudson River to New York City|ferries]]. The dominant Pennsylvania Railroad was no exception; its passenger trains ran to [[Exchange Place (PRR station)|Exchange Place]] in [[Jersey City, New Jersey|Jersey City]].{{sfn|Cudahy|2002|p=41}}
Until 1910 none of the railroads that crossed New Jersey to reach New York City crossed the [[North River (Hudson River)|Hudson River]], but had [[Railroad terminals serving New York City|terminals]] on the [[Hudson Waterfront]], where passengers boarded [[List of ferries across the Hudson River to New York City|ferries]]. The dominant Pennsylvania Railroad was no exception; its passenger trains ran to [[Exchange Place (PRR station)|Exchange Place]] in [[Jersey City, New Jersey|Jersey City]].{{sfn|Cudahy|2002|p=41}}


On November 27, 1910, the PRR opened a new line, the [[New York Tunnel Extension]], that branched off the original line two miles east of Newark. The line ran northeast across the [[New Jersey Meadowlands|Jersey Meadows]] to a pair of [[North River Tunnels|tunnels]] under the Hudson River to [[New York Penn Station]].<ref name=":0">{{Cite news|url=https://www.nytimes.com/1910/11/27/archives/pennsylvania-opens-its-great-station-first-regular-train-sent.html|title=PENNSYLVANIA OPENS ITS GREAT STATION; First Regular Train Sent Through the Hudson River Tunnel at Midnight.|date=1910-11-27|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> The new line included the Manhattan Transfer station, located just west of the split from the original PRR main line.<ref>{{cite news |title=Open Pennsylvania Station To-night |first= |last= |url=https://www.nytimes.com/1910/11/26/archives/open-pennsylvania-station-tonight-first-regular-train-to-use-the.html |newspaper=The New York Times |date=1910-11-26 |page=5 |accessdate=2011-04-02}}</ref> Passenger trains bound for New York Penn changed at Manhattan Transfer from [[steam locomotive]]s to [[electric locomotive]]s to run through the tunnel under the river.{{sfn|Cudahy|2002|p=43}} Passengers could also change trains at Manhattan Transfer. Riders on the PRR main line could transfer to PRR local trains to [[Exchange Place (PRR station)|Exchange Place]], where they could catch ferries or [[Hudson and Manhattan Railroad]] (H&M) subway trains to [[33rd Street station (PATH)|33rd Street Terminal]] in [[Manhattan]], and riders from Exchange Place could change to PRR main line trains.<ref name=":0" />
On November 27, 1910 the PRR opened a new line, the [[New York Tunnel Extension]], that branched off the original line two miles east of Newark. The line ran northeast across the [[New Jersey Meadowlands|Jersey Meadows]] to a pair of [[North River Tunnels|tunnels]] under the Hudson River to [[New York Penn Station]].<ref name=":0">{{Cite news|url=https://www.nytimes.com/1910/11/27/archives/pennsylvania-opens-its-great-station-first-regular-train-sent.html|title=PENNSYLVANIA OPENS ITS GREAT STATION; First Regular Train Sent Through the Hudson River Tunnel at Midnight.|date=1910-11-27|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> The new line included the Manhattan Transfer station, just west of the split from the original main line.<ref>{{cite news |title=Open Pennsylvania Station To-night |first= |last= |url=https://www.nytimes.com/1910/11/26/archives/open-pennsylvania-station-tonight-first-regular-train-to-use-the.html |newspaper=The New York Times |date=1910-11-26 |page=5 |accessdate=2011-04-02}}</ref> Passenger trains bound for New York Penn changed at Manhattan Transfer from steam locomotives to electric locomotives to run through the tunnel under the river.{{sfn|Cudahy|2002|p=43}} Passengers could change trains at Manhattan Transfer; riders on the main line could transfer to local trains to [[Exchange Place (PRR station)|Exchange Place]], where they could catch ferries or [[Hudson and Manhattan Railroad]] (H&M) subway trains to [[33rd Street station (PATH)|33rd Street Terminal]] in [[Manhattan]], and riders from Exchange Place could change to PRR main line trains.<ref name=":0" />


The H&M, the precursor to the [[PATH (rail system)|PATH train]], started running trains between [[Hudson Terminal]] in Manhattan and [[Park Place (H&M station)|Park Place]] in Newark on October 1, 1911.{{sfn|Cudahy|2002|p=42}}<ref name=ERA-Bulletin-Aug2015/> H&M trains made intermediate stops at [[Exchange Place station (PATH)|Exchange Place]], [[Grove Street station (PATH)|Grove Street]], [[Journal Square Transportation Center|Summit Avenue]], Manhattan Transfer, and [[Harrison station (PATH)|Harrison]].<ref name=":1">{{Cite news|url=https://www.nytimes.com/1911/11/26/archives/tube-service-to-newark-pennsylvaniahudson-steel-trains-in-operation.html|title=TUBE SERVICE TO NEWARK.; Pennsylvania-Hudson Steel Trains in Operation This Morning.|date=1911-11-26|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> Afterward, H&M trains stopped on the tracks outside the two Manhattan Transfer platforms, allowing passengers to transfer from Penn-Station-bound intercity trains.<ref>{{cite news |title=Improved Transit Facilities by Newark High Speed Line |first= |last= |url=https://timesmachine.nytimes.com/timesmachine/1911/10/01/104838501.pdf |newspaper=The New York Times |date=1911-10-01 |accessdate=2011-04-02}}</ref> H&M trains also transported some of the mail bound for PRR trains, retrieving first-class letters sent from the [[90 Church Street|Church Street Station Post Office]], near Hudson Terminal, and transferring the letters to PRR trains at Manhattan Transfer.<ref>{{Cite news|url=https://www.nytimes.com/1913/11/17/archives/new-mail-plan-saves-time-letters-will-be-sent-from-downtown-to.html|title=NEW MAIL PLAN SAVES TIME.; Letters Will Be Sent from Downtown to Manhattan Transfer Station|date=1913-11-17|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref>
The H&M, the precursor to the [[PATH (rail system)|PATH train]], started running trains between [[Hudson Terminal]] in Manhattan and [[Park Place (H&M station)|Park Place]] in Newark on October 1, 1911.{{sfn|Cudahy|2002|p=42}}<ref name=ERA-Bulletin-Aug2015/> H&M trains stopped at [[Exchange Place station (PATH)|Exchange Place]], [[Grove Street station (PATH)|Grove Street]], [[Journal Square Transportation Center|Summit Avenue]], Manhattan Transfer, and [[Harrison station (PATH)|Harrison]].<ref name=":1">{{Cite news|url=https://www.nytimes.com/1911/11/26/archives/tube-service-to-newark-pennsylvaniahudson-steel-trains-in-operation.html|title=TUBE SERVICE TO NEWARK.; Pennsylvania-Hudson Steel Trains in Operation This Morning.|date=1911-11-26|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> Afterward, H&M trains stopped on the tracks outside the two Manhattan Transfer platforms, allowing passengers to transfer from Penn-Station-bound trains.<ref>{{cite news |title=Improved Transit Facilities by Newark High Speed Line |first= |last= |url=https://timesmachine.nytimes.com/timesmachine/1911/10/01/104838501.pdf |newspaper=The New York Times |date=1911-10-01 |accessdate=2011-04-02}}</ref> H&M trains also carried mail bound for PRR trains, retrieving first-class letters sent from the [[90 Church Street|Church Street Station Post Office]], near Hudson Terminal, and transferring the letters to PRR trains at Manhattan Transfer.<ref>{{Cite news|url=https://www.nytimes.com/1913/11/17/archives/new-mail-plan-saves-time-letters-will-be-sent-from-downtown-to.html|title=NEW MAIL PLAN SAVES TIME.; Letters Will Be Sent from Downtown to Manhattan Transfer Station|date=1913-11-17|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref>


The H&M ordered MP-38 railcars to run this special service, in partnership with the PRR. The "McAdoo Reds", as the MP-38s were called, ran exclusively between Manhattan Transfer and New York City.{{sfn|Cudahy|2002|p=43}}<ref name="ERA-Bulletin-Aug2015">{{cite journal | title=Rails Under the Hudson Revisited - The Hudson and Manhattan|first=George|last=Chiasson|journal=Electric Railroaders' Association Bulletin|via=Issuu | date=August 2015 | url=https://issuu.com/erausa/docs/2015-08-bulletin | access-date=April 10, 2018|page=7}}</ref> These trains were branded with the names of both the PRR and H&M to signify their partnership.<ref name=":1" /> Through 1922, the PRR also operated a shuttle service from Manhattan Transfer to New York Penn, using six converted MP-54 cars.{{sfn|Cudahy|2002|p=47}}
The H&M ordered MP-38 railcars to run this special service, in partnership with the PRR. The "McAdoo Reds", as the MP-38s were called, ran only between Manhattan Transfer and New York City,{{sfn|Cudahy|2002|p=43}}<ref name="ERA-Bulletin-Aug2015">{{cite journal | title=Rails Under the Hudson Revisited - The Hudson and Manhattan|first=George|last=Chiasson|journal=Electric Railroaders' Association Bulletin|via=Issuu | date=August 2015 | url=https://issuu.com/erausa/docs/2015-08-bulletin | access-date=April 10, 2018|page=7}}</ref> carrying the logos of PRR and H&M to show their partnership.<ref name=":1" /> Until 1922 the PRR also operated a shuttle service from Manhattan Transfer to New York Penn, using six converted MP-54 cars.{{sfn|Cudahy|2002|p=47}}


A collision between two PRR trains occurred at Manhattan Transfer on October 27, 1921, injuring 36 people. The cause was heavy fog covering a train signal.<ref>{{Cite news|url=https://www.nytimes.com/1921/10/29/archives/hays-recovering-after-rail-crash-postmaster-general-expects-to.html|title=HAYS RECOVERING AFTER RAIL CRASH; Postmaster General Expects to Leave Today for the Capital-- One Woman Badly Hurt. FOG HID A SIGNAL LIGHT Thirty-Six Injured When Washington Express Rammed Local atManhattan Transfer.|date=1921-10-29|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> Less than a year later, on August 31, 1922, heavy fog caused another collision. This time, the collision was between two H&M trains; fifty people were injured, including eight who were seriously injured.<ref>{{cite web|url=https://www.nytimes.com/1922/09/01/archives/tube-trains-crash-in-fog-50-are-hurt-motorman-of-rear-train-charged.html|title=TUBE TRAINS CRASH IN FOG; 50 ARE HURT; Motorman of Rear Train Charged With Exceeding Rule as to Speed. HURT TOO BADLY TO TALK Eight Victims Seriously Injured, Some May Have Fractured Skulls.TWO INQUIRIES ARE BEGUNSteel Cars Prevent Loss of Life inAccident in New Jersey Meadows. First Train Halted. Motorman Unable to Talk. President Root's Statement.|date=1922-09-01|website=The New York Times|access-date=2018-06-12}}</ref> Another collision between two H&M trains near the station on July 22, 1923, killed one person and injured 15 others.<ref>{{cite web|url=https://www.nytimes.com/1923/07/12/archives/1-killed-15-injured-in-tube-train-crash-boy-standing-at-front-of.html|title=1 KILLED, 15 INJURED IN TUBE TRAIN CRASH; Boy, Standing at Front of Car, Crushed in Collision Near Manhattan Transfer. OTHERS SERIOUSLY HURT Motorman Tells Police That His Brakes Failed to Work Properly.|date=1923-07-12|website=The New York Times|access-date=2018-06-12}}</ref> A crash between two PRR trains occurred at the station on February 24, 1925, killing 3 and injuring 32 more.<ref>{{Cite news|url=https://www.nytimes.com/1925/02/25/archives/3-killed-32-injured-in-train-collision-on-jersey-meadows.html|title=3 KILLED, 32 INJURED IN TRAIN COLLISION ON JERSEY MEADOWS; Pennsylvania Local Speeds Into Atlantic Coast Express at Manhattan Transfer. DINING CAR TELESCOPED Motorman and His Helper Leap to Safety Just Before the Collision. CAR INSPECTORS KILLED Negro Cook Crushed to Death as He Shouts a Warning -- Responsibility Not Fixed. 3 KILLED, 32 INJURED IN TRAIN COLLISION|date=1925-02-25|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref>
A collision between two PRR trains occurred at Manhattan Transfer on October 27, 1921, injuring 36 people. The cause was heavy fog covering a train signal.<ref>{{Cite news|url=https://www.nytimes.com/1921/10/29/archives/hays-recovering-after-rail-crash-postmaster-general-expects-to.html|title=HAYS RECOVERING AFTER RAIL CRASH; Postmaster General Expects to Leave Today for the Capital-- One Woman Badly Hurt. FOG HID A SIGNAL LIGHT Thirty-Six Injured When Washington Express Rammed Local atManhattan Transfer.|date=1921-10-29|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> Less than a year later, on August 31, 1922, heavy fog caused another collision. This time, the collision was between two H&M trains; fifty people were injured, including eight who were seriously injured.<ref>{{cite web|url=https://www.nytimes.com/1922/09/01/archives/tube-trains-crash-in-fog-50-are-hurt-motorman-of-rear-train-charged.html|title=TUBE TRAINS CRASH IN FOG; 50 ARE HURT; Motorman of Rear Train Charged With Exceeding Rule as to Speed. HURT TOO BADLY TO TALK Eight Victims Seriously Injured, Some May Have Fractured Skulls.TWO INQUIRIES ARE BEGUNSteel Cars Prevent Loss of Life inAccident in New Jersey Meadows. First Train Halted. Motorman Unable to Talk. President Root's Statement.|date=1922-09-01|website=The New York Times|access-date=2018-06-12}}</ref> Another collision between two H&M trains near the station on July 22, 1923, killed one person and injured 15 others.<ref>{{cite web|url=https://www.nytimes.com/1923/07/12/archives/1-killed-15-injured-in-tube-train-crash-boy-standing-at-front-of.html|title=1 KILLED, 15 INJURED IN TUBE TRAIN CRASH; Boy, Standing at Front of Car, Crushed in Collision Near Manhattan Transfer. OTHERS SERIOUSLY HURT Motorman Tells Police That His Brakes Failed to Work Properly.|date=1923-07-12|website=The New York Times|access-date=2018-06-12}}</ref> A crash between two PRR trains occurred at the station on February 24, 1925, killing 3 and injuring 32 more.<ref>{{Cite news|url=https://www.nytimes.com/1925/02/25/archives/3-killed-32-injured-in-train-collision-on-jersey-meadows.html|title=3 KILLED, 32 INJURED IN TRAIN COLLISION ON JERSEY MEADOWS; Pennsylvania Local Speeds Into Atlantic Coast Express at Manhattan Transfer. DINING CAR TELESCOPED Motorman and His Helper Leap to Safety Just Before the Collision. CAR INSPECTORS KILLED Negro Cook Crushed to Death as He Shouts a Warning -- Responsibility Not Fixed. 3 KILLED, 32 INJURED IN TRAIN COLLISION|date=1925-02-25|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref>


=== Decline ===
=== Decline ===
The Manhattan Transfer station was constructed mainly because PRR trains needed to switch to electric locomotives. In 1913, the PRR's board voted to [[Pennsylvania Railroad#Electrification|electrify its main line]] in the [[Philadelphia]] area using an [[Amtrak's 25 Hz traction power system|11 kV overhead catenary system]] for the use of long-distance trains.<ref>{{Cite news|url=http://fultonhistory.com/highlighter/highlight-for-xml?altUrl=http%3A%2F%2Ffultonhistory.com%2FNewspapers%252023%2FPhiladelphia%2520PA%2520Inquirer%2FPhiladelphia%2520PA%2520Inquirer%25201913%2FPhiladelphia%2520PA%2520Inquirer%25201913%2520-%25201030.pdf|title=Philadelphia Electric or Lehigh Navigation Likely to Secure Big Power Contracts From Pennsylvania Railroad|date=1913-03-13|work=Philadelphia Inquirer|access-date=2018-04-10|page=15|via=fultonhistory.com}}</ref> This mostly had to do with the PRR's cumbersome operations at [[Broad Street Station (Philadelphia)|Broad Street Station]] in Philadelphia, where trains had to enter and leave the terminal from the same side, and congestion frequently arose because of the length of time needed in order for the steam-powered locomotives to switch directions.<ref>{{Harvard citation no brackets|Cudahy|2002|pages=48&ndash;49}}</ref> At the time, the tracks at Manhattan Transfer were originally electrified using 650 [[Volt|V]] [[third rail]], which was used by PRR electric trains to Penn Station and Exchange Place, as well as by H&M trains between Park Place and Hudson Terminal.<ref name=":4">{{Harvard citation no brackets|Cudahy|2002|page=52}}</ref>
Manhattan Transfer was built mainly because PRR trains needed to switch to electric locomotives. In 1913 the PRR's board voted to [[Pennsylvania Railroad#Electrification|electrify its main line]] in the Philadelphia area using an [[Amtrak's 25 Hz traction power system|11 kV overhead catenary system]].<ref>{{Cite news|url=http://fultonhistory.com/highlighter/highlight-for-xml?altUrl=http%3A%2F%2Ffultonhistory.com%2FNewspapers%252023%2FPhiladelphia%2520PA%2520Inquirer%2FPhiladelphia%2520PA%2520Inquirer%25201913%2FPhiladelphia%2520PA%2520Inquirer%25201913%2520-%25201030.pdf|title=Philadelphia Electric or Lehigh Navigation Likely to Secure Big Power Contracts From Pennsylvania Railroad|date=1913-03-13|work=Philadelphia Inquirer|access-date=2018-04-10|page=15|via=fultonhistory.com}}</ref> This had to do with the PRR's cumbersome operations at [[Broad Street Station (Philadelphia)|Broad Street Station]] in Philadelphia, where trains had to enter and leave the terminal from the same side, and congestion frequently arose because of the length of time needed for steam locomotives to switch directions.<ref>{{Harvard citation no brackets|Cudahy|2002|pages=48&ndash;49}}</ref> Tracks at Manhattan Transfer were originally electrified with 650 [[Volt|V]] [[third rail]], which was used by PRR electric trains to Penn Station and Exchange Place, and by H&M trains between Park Place and Hudson Terminal.<ref name=":4">{{Harvard citation no brackets|Cudahy|2002|page=52}}</ref>


In 1928, the PRR and the Newark government agreed to construct a new [[Pennsylvania Station (Newark)|Newark Penn Station]] to replace three stations: Manhattan Transfer, Park Place, and the PRR's Market Street station in Newark. Newark Penn was to be located a quarter-mile south of Park Place.<ref>{{Cite news|url=https://www.nytimes.com/1928/04/13/archives/newark-to-get-20000000-railroad-station-manhattan-transfer-will-be.html|title=Newark to Get $20,000,000 Railroad Station; Manhattan Transfer Will Be Abolished|date=1928-04-13|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> The H&M would be extended to Newark Penn via new approach tracks over the [[Passaic River]], and H&M and PRR passengers would be able to make the connection at Newark Penn instead of Manhattan Transfer.<ref>{{Cite news|url=https://www.nytimes.com/1928/05/10/archives/new-newark-station-to-cost-25000000-raymond-announces-terms-of.html|title=NEW NEWARK STATION TO COST $25,000,000; Raymond Announces Terms of Contract Which Will Abolish Manhattan Transfer.|date=1928-05-10|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref>
In 1928 the PRR and the Newark government agreed to build a new [[Pennsylvania Station (Newark)|Newark Penn Station]] to replace three stations: Manhattan Transfer, Park Place, and the PRR's Market Street station in Newark. Newark Penn was to be a quarter-mile south of Park Place.<ref>{{Cite news|url=https://www.nytimes.com/1928/04/13/archives/newark-to-get-20000000-railroad-station-manhattan-transfer-will-be.html|title=Newark to Get $20,000,000 Railroad Station; Manhattan Transfer Will Be Abolished|date=1928-04-13|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> The H&M would be extended to Newark Penn via new approach tracks over the [[Passaic River]], and H&M and PRR passengers would be able to connect at Newark Penn instead of Manhattan Transfer.<ref>{{Cite news|url=https://www.nytimes.com/1928/05/10/archives/new-newark-station-to-cost-25000000-raymond-announces-terms-of.html|title=NEW NEWARK STATION TO COST $25,000,000; Raymond Announces Terms of Contract Which Will Abolish Manhattan Transfer.|date=1928-05-10|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref>


Contracts to electrify the PRR tracks south of Manhattan Transfer with 11 kV overhead wires were awarded in 1929.<ref>{{Cite news|url=https://www.nytimes.com/1929/10/08/archives/prr-awards-contract-will-electrify-line-from-manhattan-transfer-to.html|title=P.R.R. AWARDS CONTRACT.; Will Electrify Line From Manhattan Transfer to New Brunswick.|date=1929-10-08|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> Two years later, in light of low interest rates and high unemployment, the PRR's president announced plans to speed up the electrification project, with plans to complete it in two-and-a-half years instead of four.<ref>"Pennsylvania Railroad Speeds Electrification Program" :Improvements originally scheduled for next four years will be completed by 1933, according to announcement by President Atterbury. Plans involve expenditure of $175,000,000, [[Electric Railway Journal]], March 1931, pg. 125-127, https://archive.org/stream/electricrailwayj75mcgrrich/electricrailwayj75mcgrrich_djvu.txt</ref> In addition, new approach tracks to Newark Penn would be built over the [[Passaic River]].<ref>{{Cite news|url=https://www.nytimes.com/1931/02/18/archives/pennsylvania-lines-speed-construction-to-spend-175000000-atterbury.html|title=PENNSYLVANIA LINES SPEED CONSTRUCTION; TO SPEND $175,000,000; Atterbury Announces Decision to Rush Electrification, New Stations and Other Work. REDUCES 4-YEAR ESTIMATE Says Program Will Be Pushed to Completion in Two and a Half Years. SEES EMPLOYMENT AIDED Declares Conditions of Labor and Finance Are Favorable Now for Expansion. Mr. Atterbury's Statement. Lists Rail Projects. ATTERBURY PUSHES VAST RAIL PROGRAM Optimistic for Future.|date=1931-02-18|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> PRR trains to Exchange Place started using the 11 kV catenary system in December 1932.<ref name=":4" /> Within two months, the PRR had completed the electrification of the main line from Philadelphia north to New York Penn Station; south to the PRR station in [[Wilmington station (Delaware)|Wilmington, Delaware]]; and west to the [[Paoli station|Paoli, Pennsylvania]], PRR station. By March 1933, all PRR trains running along that stretch of the main line were pulled by electric engines. Thus, trips into New York Penn Station no longer needed to change engines at Manhattan Transfer, and the third rail between New York Penn and Manhattan Transfer was removed.<ref>{{Harvard citation no brackets|Cudahy|2002|page=51}}</ref> PRR trains continued to stop there for the H&M connection, however.<ref name=":3">{{Harvard citation no brackets|Cudahy|2002|page=53}}</ref>
Contracts to electrify the PRR tracks south of Manhattan Transfer with 11 kV overhead wires were awarded in 1929.<ref>{{Cite news|url=https://www.nytimes.com/1929/10/08/archives/prr-awards-contract-will-electrify-line-from-manhattan-transfer-to.html|title=P.R.R. AWARDS CONTRACT.; Will Electrify Line From Manhattan Transfer to New Brunswick.|date=1929-10-08|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> Two years later, in light of low interest rates and high unemployment, the PRR's president announced plans to speed up the electrification project, with plans to complete it in two-and-a-half years instead of four.<ref>"Pennsylvania Railroad Speeds Electrification Program" :Improvements originally scheduled for next four years will be completed by 1933, according to announcement by President Atterbury. Plans involve expenditure of $175,000,000, [[Electric Railway Journal]], March 1931, pg. 125-127, https://archive.org/stream/electricrailwayj75mcgrrich/electricrailwayj75mcgrrich_djvu.txt</ref> In addition, new approach tracks to Newark Penn would be built over the [[Passaic River]].<ref>{{Cite news|url=https://www.nytimes.com/1931/02/18/archives/pennsylvania-lines-speed-construction-to-spend-175000000-atterbury.html|title=PENNSYLVANIA LINES SPEED CONSTRUCTION; TO SPEND $175,000,000; Atterbury Announces Decision to Rush Electrification, New Stations and Other Work. REDUCES 4-YEAR ESTIMATE Says Program Will Be Pushed to Completion in Two and a Half Years. SEES EMPLOYMENT AIDED Declares Conditions of Labor and Finance Are Favorable Now for Expansion. Mr. Atterbury's Statement. Lists Rail Projects. ATTERBURY PUSHES VAST RAIL PROGRAM Optimistic for Future.|date=1931-02-18|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref> PRR trains to Exchange Place started using the 11 kV catenary system in December 1932.<ref name=":4" /> Within two months, the PRR had completed the electrification of the main line from Philadelphia north to New York Penn Station; south to the PRR station in [[Wilmington station (Delaware)|Wilmington, Delaware]]; and west to the [[Paoli station|Paoli, Pennsylvania]], PRR station. By March 1933 most PRR trains on that stretch of the main line were pulled by electric engines, but PRR trains continued to stop at Manhattan Transfer for the H&M connection.<ref name=":3">{{Harvard citation no brackets|Cudahy|2002|page=53}}</ref> (The branch to South Amboy remained steam for a couple more years, so a few engine changes continued at Manhattan Transfer.) Around 1940 the third rail west of the west end of the tunnels was removed.<ref>{{Harvard citation no brackets|Cudahy|2002|page=51}}</ref>


On June 20, 1937, the H&M moved its terminus from Park Place to Newark Penn Station, and Manhattan Transfer and Park Place were closed.<ref>{{cite news |title=New Station Open for Hudson Tubes |first= |last= |newspaper=The New York Times |date=1937-06-20 |page=35 }}</ref><ref>{{Cite news|url=http://fultonhistory.com/highlighter/highlight-for-xml?altUrl=http%3A%2F%2Ffultonhistory.com%2FNewspaper%252018%2FMount%2520Vernon%2520NY%2520Daily%2520Argus%2FMount%2520Vernon%2520NY%2520Daily%2520Argus%25201937%2FMount%2520Vernon%2520NY%2520Daily%2520Argus%25201937%2520-%25202874.pdf|title=OLD MANHATTAN TRANSFER GOES|date=1937-06-19|work=The Daily Argus|access-date=2018-04-11|publisher=Associated Press|location=Mount Vernon, NY|page=2|via=fultonhistory.com}}</ref> Newark Penn not only allowed transfers between the H&M, the PRR, and the newly extended [[Newark City Subway]], but also contained exits to local streets.<ref name=":3" /> Manhattan Transfer station was demolished, but the site of the former station could be seen through the 1960s. The site of the eastbound platform was partly replaced by a train yard for the [[Central Railroad of New Jersey]] (CNJ) in 1967. As a result of the opening of the [[Aldene Connection]], the CNJ started operating trains to PRR's Newark Penn Station, and the CNJ had to store its trains in the yard that replaced the eastbound platform's site.<ref>{{Harvard citation no brackets|Cudahy|2002|page=54}}</ref>
On June 20, 1937 the H&M moved from Park Place to Newark Penn Station, and Manhattan Transfer and Park Place closed.<ref>{{cite news |title=New Station Open for Hudson Tubes |first= |last= |newspaper=The New York Times |date=1937-06-20 |page=35 }}</ref><ref>{{Cite news|url=http://fultonhistory.com/highlighter/highlight-for-xml?altUrl=http%3A%2F%2Ffultonhistory.com%2FNewspaper%252018%2FMount%2520Vernon%2520NY%2520Daily%2520Argus%2FMount%2520Vernon%2520NY%2520Daily%2520Argus%25201937%2FMount%2520Vernon%2520NY%2520Daily%2520Argus%25201937%2520-%25202874.pdf|title=OLD MANHATTAN TRANSFER GOES|date=1937-06-19|work=The Daily Argus|access-date=2018-04-11|publisher=Associated Press|location=Mount Vernon, NY|page=2|via=fultonhistory.com}}</ref> Newark Penn allowed transfers between the H&M, the PRR, and the newly extended [[Newark City Subway]], and had exits to the street.<ref name=":3" /> Manhattan Transfer was demolished, but the site of the platforms could be seen through the 1960s. The site of the eastbound platform was partly replaced by a yard for the [[Central Railroad of New Jersey]] (CNJ) in 1967. After the opening of the [[Aldene Connection]], the CNJ started running trains to PRR's Newark Penn Station, and the CNJ stored its trains in the yard on the eastbound platform's site.<ref>{{Harvard citation no brackets|Cudahy|2002|page=54}}</ref>


The term Manhattan Transfer gained considerable public familiarity in its time, and the name became used in other contexts. In 1925, [[John Dos Passos]] published a [[Manhattan Transfer (novel)|critically acclaimed novel]] about the busyness of New York City.<ref name="Harding2004">{{cite book|url=https://books.google.com/books?id=M8GTAgAAQBAJ&pg=PA176|title=Writing the City: Urban Visions and Literary Modernism|author=Desmond Harding|date=1 June 2004|publisher=Routledge|isbn=978-1-135-94747-7|page=176}}</ref><ref>{{Cite news|url=https://www.nytimes.com/2003/08/30/books/a-second-act-for-dos-passos-and-his-panoramic-writings.html|title=A Second Act for Dos Passos And His Panoramic Writings|last=Brinkley|first=Douglas|date=2003-08-30|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref><ref>{{Harvard citation no brackets|Cudahy|2002|pages=48&ndash;49}}</ref> The tributes to Manhattan Transfer station also include a [[The Manhattan Transfer|jazz vocal ensemble]] formed in 1969.
Manhattan Transfer became famous, and the name was used in other contexts. In 1925 [[John Dos Passos]] published an [[Manhattan Transfer (novel)|acclaimed novel]] about the busyness of New York City.<ref name="Harding2004">{{cite book|url=https://books.google.com/books?id=M8GTAgAAQBAJ&pg=PA176|title=Writing the City: Urban Visions and Literary Modernism|author=Desmond Harding|date=1 June 2004|publisher=Routledge|isbn=978-1-135-94747-7|page=176}}</ref><ref>{{Cite news|url=https://www.nytimes.com/2003/08/30/books/a-second-act-for-dos-passos-and-his-panoramic-writings.html|title=A Second Act for Dos Passos And His Panoramic Writings|last=Brinkley|first=Douglas|date=2003-08-30|work=The New York Times|access-date=2018-04-11|language=en-US|issn=0362-4331}}</ref><ref>{{Harvard citation no brackets|Cudahy|2002|pages=48&ndash;49}}</ref> The tributes to Manhattan Transfer station include a [[The Manhattan Transfer|jazz vocal ensemble]] formed in 1969.


==Layout==
==Layout==

Revision as of 17:35, 23 October 2019

Manhattan Transfer
circa 1912
General information
LocationNortheast Corridor
Harrison, New Jersey
Coordinates40°44′31″N 74°08′38″W / 40.742°N 74.144°W / 40.742; -74.144 (Manhattan Transfer)
Owned byPRR & H&M
Line(s)PRR main line
Park Place – Hudson Terminal
Platforms4
Tracks4
History
Opened1910
ClosedJune 20, 1937
Electrified(DC) Third Rail
Former services
Preceding station Pennsylvania Railroad Following station
Newark Market Street
toward Chicago
Main Line Exchange Place
Terminus
New York
Terminus
Newark Market Street New Brunswick Line Harrison
Closed 1910
New York
Terminus
Preceding station Lehigh Valley Railroad Following station
Newark Market Street
toward Buffalo
Main Line New York
Terminus
Jersey City
1913–1918
Terminus
Exchange Place
Until 1913
Terminus
Preceding station Baltimore and Ohio Railroad Following station
Bound Brook
toward Chicago
Main Line
Until 1926
New York
Terminus
Preceding station Hudson and Manhattan Railroad Following station
Harrison
toward Park Place
Park Place – Hudson Terminal Summit Avenue

Manhattan Transfer was a passenger transfer station in Harrison, New Jersey, east of Newark, 8.8 miles (14.2 km) west of New York Penn Station on the Pennsylvania Railroad (PRR) main line, now Amtrak's Northeast Corridor. It operated from 1910 to 1937 and consisted of two 1,100 feet (340 m) car-floor-level platforms, one on each side of the PRR line. It was also served by the Hudson and Manhattan Railroad. There were no pedestrian entrances or exits to the station, as its sole purpose was for passengers to change trains.

History

Need and operation

1912 map showing PRR lines to Jersey City waterfront and newly built Tunnel Extension. Equipment changes took place at Harrison Interchange Yard, where passengers could also transfer.

Until 1910 none of the railroads that crossed New Jersey to reach New York City crossed the Hudson River, but had terminals on the Hudson Waterfront, where passengers boarded ferries. The dominant Pennsylvania Railroad was no exception; its passenger trains ran to Exchange Place in Jersey City.[1]

On November 27, 1910 the PRR opened a new line, the New York Tunnel Extension, that branched off the original line two miles east of Newark. The line ran northeast across the Jersey Meadows to a pair of tunnels under the Hudson River to New York Penn Station.[2] The new line included the Manhattan Transfer station, just west of the split from the original main line.[3] Passenger trains bound for New York Penn changed at Manhattan Transfer from steam locomotives to electric locomotives to run through the tunnel under the river.[4] Passengers could change trains at Manhattan Transfer; riders on the main line could transfer to local trains to Exchange Place, where they could catch ferries or Hudson and Manhattan Railroad (H&M) subway trains to 33rd Street Terminal in Manhattan, and riders from Exchange Place could change to PRR main line trains.[2]

The H&M, the precursor to the PATH train, started running trains between Hudson Terminal in Manhattan and Park Place in Newark on October 1, 1911.[5][6] H&M trains stopped at Exchange Place, Grove Street, Summit Avenue, Manhattan Transfer, and Harrison.[7] Afterward, H&M trains stopped on the tracks outside the two Manhattan Transfer platforms, allowing passengers to transfer from Penn-Station-bound trains.[8] H&M trains also carried mail bound for PRR trains, retrieving first-class letters sent from the Church Street Station Post Office, near Hudson Terminal, and transferring the letters to PRR trains at Manhattan Transfer.[9]

The H&M ordered MP-38 railcars to run this special service, in partnership with the PRR. The "McAdoo Reds", as the MP-38s were called, ran only between Manhattan Transfer and New York City,[4][6] carrying the logos of PRR and H&M to show their partnership.[7] Until 1922 the PRR also operated a shuttle service from Manhattan Transfer to New York Penn, using six converted MP-54 cars.[10]

A collision between two PRR trains occurred at Manhattan Transfer on October 27, 1921, injuring 36 people. The cause was heavy fog covering a train signal.[11] Less than a year later, on August 31, 1922, heavy fog caused another collision. This time, the collision was between two H&M trains; fifty people were injured, including eight who were seriously injured.[12] Another collision between two H&M trains near the station on July 22, 1923, killed one person and injured 15 others.[13] A crash between two PRR trains occurred at the station on February 24, 1925, killing 3 and injuring 32 more.[14]

Decline

Manhattan Transfer was built mainly because PRR trains needed to switch to electric locomotives. In 1913 the PRR's board voted to electrify its main line in the Philadelphia area using an 11 kV overhead catenary system.[15] This had to do with the PRR's cumbersome operations at Broad Street Station in Philadelphia, where trains had to enter and leave the terminal from the same side, and congestion frequently arose because of the length of time needed for steam locomotives to switch directions.[16] Tracks at Manhattan Transfer were originally electrified with 650 V third rail, which was used by PRR electric trains to Penn Station and Exchange Place, and by H&M trains between Park Place and Hudson Terminal.[17]

In 1928 the PRR and the Newark government agreed to build a new Newark Penn Station to replace three stations: Manhattan Transfer, Park Place, and the PRR's Market Street station in Newark. Newark Penn was to be a quarter-mile south of Park Place.[18] The H&M would be extended to Newark Penn via new approach tracks over the Passaic River, and H&M and PRR passengers would be able to connect at Newark Penn instead of Manhattan Transfer.[19]

Contracts to electrify the PRR tracks south of Manhattan Transfer with 11 kV overhead wires were awarded in 1929.[20] Two years later, in light of low interest rates and high unemployment, the PRR's president announced plans to speed up the electrification project, with plans to complete it in two-and-a-half years instead of four.[21] In addition, new approach tracks to Newark Penn would be built over the Passaic River.[22] PRR trains to Exchange Place started using the 11 kV catenary system in December 1932.[17] Within two months, the PRR had completed the electrification of the main line from Philadelphia north to New York Penn Station; south to the PRR station in Wilmington, Delaware; and west to the Paoli, Pennsylvania, PRR station. By March 1933 most PRR trains on that stretch of the main line were pulled by electric engines, but PRR trains continued to stop at Manhattan Transfer for the H&M connection.[23] (The branch to South Amboy remained steam for a couple more years, so a few engine changes continued at Manhattan Transfer.) Around 1940 the third rail west of the west end of the tunnels was removed.[24]

On June 20, 1937 the H&M moved from Park Place to Newark Penn Station, and Manhattan Transfer and Park Place closed.[25][26] Newark Penn allowed transfers between the H&M, the PRR, and the newly extended Newark City Subway, and had exits to the street.[23] Manhattan Transfer was demolished, but the site of the platforms could be seen through the 1960s. The site of the eastbound platform was partly replaced by a yard for the Central Railroad of New Jersey (CNJ) in 1967. After the opening of the Aldene Connection, the CNJ started running trains to PRR's Newark Penn Station, and the CNJ stored its trains in the yard on the eastbound platform's site.[27]

Manhattan Transfer became famous, and the name was used in other contexts. In 1925 John Dos Passos published an acclaimed novel about the busyness of New York City.[28][29][30] The tributes to Manhattan Transfer station include a jazz vocal ensemble formed in 1969.

Layout

Manhattan Transfer station consisted of two island platforms, one for westbound trains and one for eastbound trains. Each platform measured 1,100 feet (340 m) long and 28 feet (8.5 m) wide. The station itself contained four tracks, but several bypass tracks surrounded the station to the south and north, as well as passed between the two platforms. H&M trains stopped on the outer tracks, while PRR trains stopped on the inner tracks.[1] The two platforms were made of brick, which started to deteriorate during the station's later years.[31]

West of the station, the H&M tracks split to the northwest and entered a viaduct, stopping at Harrison before terminating at Park Place station in Newark. PRR trains, meanwhile, continued southeast[5] East of the station, the PRR tracks split to the northeast and continued 8 miles (13 km) to New York Penn, while the H&M tracks split to the southeast and continued 7 miles (11 km) to Exchange Place before entering the Downtown Hudson Tubes and continuing east to Hudson Terminal in New York City.[5] There were two switch towers near the station: Tower N to the west and Tower S to the east.[6]

To aid passengers, a dynamic sign box was placed above each platform. Each box contained around twenty signs, which displayed common destinations, as well as "named" trains, i.e. trips that had been given official designations. Before the arrival of the next train, a platform attendant would use a long semaphore-like pole to change the signs that were being displayed.[10]

The only access to the station was by train, and no access was provided to or from the surrounding area.[32][33][5] It was estimated that 230 million passengers had used Manhattan Transfer during its 27 years in operation.[31]

See also

References

  1. ^ a b Cudahy 2002, p. 41.
  2. ^ a b "PENNSYLVANIA OPENS ITS GREAT STATION; First Regular Train Sent Through the Hudson River Tunnel at Midnight". The New York Times. 1910-11-27. ISSN 0362-4331. Retrieved 2018-04-11.
  3. ^ "Open Pennsylvania Station To-night". The New York Times. 1910-11-26. p. 5. Retrieved 2011-04-02.
  4. ^ a b Cudahy 2002, p. 43.
  5. ^ a b c d Cudahy 2002, p. 42.
  6. ^ a b c Chiasson, George (August 2015). "Rails Under the Hudson Revisited - The Hudson and Manhattan". Electric Railroaders' Association Bulletin: 7. Retrieved April 10, 2018 – via Issuu.
  7. ^ a b "TUBE SERVICE TO NEWARK.; Pennsylvania-Hudson Steel Trains in Operation This Morning". The New York Times. 1911-11-26. ISSN 0362-4331. Retrieved 2018-04-11.
  8. ^ "Improved Transit Facilities by Newark High Speed Line" (PDF). The New York Times. 1911-10-01. Retrieved 2011-04-02.
  9. ^ "NEW MAIL PLAN SAVES TIME.; Letters Will Be Sent from Downtown to Manhattan Transfer Station". The New York Times. 1913-11-17. ISSN 0362-4331. Retrieved 2018-04-11.
  10. ^ a b Cudahy 2002, p. 47.
  11. ^ "HAYS RECOVERING AFTER RAIL CRASH; Postmaster General Expects to Leave Today for the Capital-- One Woman Badly Hurt. FOG HID A SIGNAL LIGHT Thirty-Six Injured When Washington Express Rammed Local atManhattan Transfer". The New York Times. 1921-10-29. ISSN 0362-4331. Retrieved 2018-04-11.
  12. ^ "TUBE TRAINS CRASH IN FOG; 50 ARE HURT; Motorman of Rear Train Charged With Exceeding Rule as to Speed. HURT TOO BADLY TO TALK Eight Victims Seriously Injured, Some May Have Fractured Skulls.TWO INQUIRIES ARE BEGUNSteel Cars Prevent Loss of Life inAccident in New Jersey Meadows. First Train Halted. Motorman Unable to Talk. President Root's Statement". The New York Times. 1922-09-01. Retrieved 2018-06-12.
  13. ^ "1 KILLED, 15 INJURED IN TUBE TRAIN CRASH; Boy, Standing at Front of Car, Crushed in Collision Near Manhattan Transfer. OTHERS SERIOUSLY HURT Motorman Tells Police That His Brakes Failed to Work Properly". The New York Times. 1923-07-12. Retrieved 2018-06-12.
  14. ^ "3 KILLED, 32 INJURED IN TRAIN COLLISION ON JERSEY MEADOWS; Pennsylvania Local Speeds Into Atlantic Coast Express at Manhattan Transfer. DINING CAR TELESCOPED Motorman and His Helper Leap to Safety Just Before the Collision. CAR INSPECTORS KILLED Negro Cook Crushed to Death as He Shouts a Warning -- Responsibility Not Fixed. 3 KILLED, 32 INJURED IN TRAIN COLLISION". The New York Times. 1925-02-25. ISSN 0362-4331. Retrieved 2018-04-11.
  15. ^ "Philadelphia Electric or Lehigh Navigation Likely to Secure Big Power Contracts From Pennsylvania Railroad" (PDF). Philadelphia Inquirer. 1913-03-13. p. 15. Retrieved 2018-04-10 – via fultonhistory.com.
  16. ^ Cudahy 2002, pp. 48–49
  17. ^ a b Cudahy 2002, p. 52
  18. ^ "Newark to Get $20,000,000 Railroad Station; Manhattan Transfer Will Be Abolished". The New York Times. 1928-04-13. ISSN 0362-4331. Retrieved 2018-04-11.
  19. ^ "NEW NEWARK STATION TO COST $25,000,000; Raymond Announces Terms of Contract Which Will Abolish Manhattan Transfer". The New York Times. 1928-05-10. ISSN 0362-4331. Retrieved 2018-04-11.
  20. ^ "P.R.R. AWARDS CONTRACT.; Will Electrify Line From Manhattan Transfer to New Brunswick". The New York Times. 1929-10-08. ISSN 0362-4331. Retrieved 2018-04-11.
  21. ^ "Pennsylvania Railroad Speeds Electrification Program" :Improvements originally scheduled for next four years will be completed by 1933, according to announcement by President Atterbury. Plans involve expenditure of $175,000,000, Electric Railway Journal, March 1931, pg. 125-127, https://archive.org/stream/electricrailwayj75mcgrrich/electricrailwayj75mcgrrich_djvu.txt
  22. ^ "PENNSYLVANIA LINES SPEED CONSTRUCTION; TO SPEND $175,000,000; Atterbury Announces Decision to Rush Electrification, New Stations and Other Work. REDUCES 4-YEAR ESTIMATE Says Program Will Be Pushed to Completion in Two and a Half Years. SEES EMPLOYMENT AIDED Declares Conditions of Labor and Finance Are Favorable Now for Expansion. Mr. Atterbury's Statement. Lists Rail Projects. ATTERBURY PUSHES VAST RAIL PROGRAM Optimistic for Future". The New York Times. 1931-02-18. ISSN 0362-4331. Retrieved 2018-04-11.
  23. ^ a b Cudahy 2002, p. 53
  24. ^ Cudahy 2002, p. 51
  25. ^ "New Station Open for Hudson Tubes". The New York Times. 1937-06-20. p. 35.
  26. ^ "OLD MANHATTAN TRANSFER GOES" (PDF). The Daily Argus. Mount Vernon, NY: Associated Press. 1937-06-19. p. 2. Retrieved 2018-04-11 – via fultonhistory.com.
  27. ^ Cudahy 2002, p. 54
  28. ^ Desmond Harding (1 June 2004). Writing the City: Urban Visions and Literary Modernism. Routledge. p. 176. ISBN 978-1-135-94747-7.
  29. ^ Brinkley, Douglas (2003-08-30). "A Second Act for Dos Passos And His Panoramic Writings". The New York Times. ISSN 0362-4331. Retrieved 2018-04-11.
  30. ^ Cudahy 2002, pp. 48–49
  31. ^ a b Cudahy 2002, p. 48
  32. ^ E.B., Temple (September 1910), The New York Tunnel Extension of the Pennsylvania Railroad Meadows Division and Harrison Transfer Yard., Transactions of the American Society of Civil Engineers, Vol. LXVIII, Paper No. 1153, American Society of Civil Engineers
  33. ^ "New High-Speed Line for Newark; Being Built by Pennsylvania Railroad and Hudson & Manhattan Company" (PDF). New York Times. 1911-04-02.