Jump to content

Cuttack–Sambalpur line

From Wikipedia, the free encyclopedia

Cuttack–Sambalpur line
Cuttack railway station the starting point of Cuttack–Sambalpur line
Overview
StatusOperational
OwnerIndian Railways
LocaleOdisha
Termini
Service
Operator(s)East Coast Railway
History
Opened1998
Technical
Track length284 km (176 mi)
Number of tracks2
Track gauge5 ft 6 in (1,676 mm) broad gauge
ElectrificationYes (since 2018)
Operating speedup to 100 km/h (62 mph)
Route map

km
km
0
Cuttack Junction
Kendrapara Road
4
2
Katha Jori
Manguli Chowdar
8
4
Gopalpur Balikuda
Nergundi Junction
11
12
Barang Junction
Junction
to Puri
to Howrah
Kapilas
Road Jn
15
Salagaon
19/15
21
Naraj Marthapur
Charbatia
23/19
24
Sarpeswar
Bada Padagaon
27/23
Gurudijhatia
32/28
28
Ghantikhal Nidhipur
Machapur
38/34
34
Radhakishorepur
41/37
37
Rajathgarh Junction
53/49
Joranda Road
56/52
Shyama Charanpur Halt
60/56
Dhenkanal
68/64
Dandi Mal
72/68
Sadashibapur
77/73
Mahadia
81/77
Hindol Road
85/81
Nayabhagirathipur
94/90
Meramandali
102/98
Budhapank
Talcher Thermal
109/105
109/105
Talcher Road
NTPC Exchange
Yard Talcher
110/106
122/118
Angul
Talcher
113/109
135/131
Kerejanga
145/141
Jarapada
161/157
Boinda
168/164
Handapa
182/178
Saragipali
192/188
Bamur
207/203
Rairakhol
222/218
Charmal
240/236
Jujumura
251/247
Hatibari
264/260
Maneswar
273/269
Sambalpur City
276/272
Sarla Junction
277/273
Sambalpur Road
279/275
Sambalpur Junction
km
km

The Cuttack–Sambalpur line is a railway line connecting the cities of Cuttack with the Sambalpur, in the Indian state of Odisha.

Geography

[edit]

The Cuttack–Sambalpur line traverses the center of Odisha running along the river Mahanadi. Its route connects four districts of Odisha: Cuttack, Dhenkanal, Angul and Sambalpur. It connects the Mahanadi Coalfields in Talcher and Nalco in Angul to Howrah–Chennai main line in the east and Jharsuguda–Vizianagaram line in the west. It also connects Mahanadi Coalfields in Western Odisha to Talcher.

History

[edit]

In 1922, a railway line was built from Talcher to Nergundi to connect the coalfields in Talcher to the Howrah-Chennai main line.[1] But since there was a need to connect the coalfields of Western Odisha to Eastern Odisha, the Talcher–Sambalpur railway project was commissioned in 1983 and the work began in 1987. It was completed in 1996 and became operational in 1998. The flagging off of the Tapaswini Express, the first passenger train of the section by the Hon'ble Minister of Railways, fulfilled the long cherished dream of the people of Odisha to have a cultural, emotional, and socio-economic integration of the eastern and western parts of the State. This rail link, apart from relieving congestion of the Howrah–Mumbai and Howrah–Chennai trunk routes, reduced the distance between Cuttack, Bhubaneswar, and Puri, respectively the commercial, political, and cultural capitals of Odisha, to important Indian cities of Western and Northern India such as Mumbai, New Delhi, etc. by 380 km.[2]

Electrification and doubling

[edit]

The track doubling and the electrification of the Nergundi–Talcher section were completed in 2015. The electrification of Talcher–Sambalpur section was completed in 2018. The track doubling work of Talcher-Sambalpur was completed in 2023, thus completing the track doubling and electrification of the entire Cuttack-Sambalpur route. [3]

[edit]

This railway line connects NALCO and NTPC plants in Angul to rest of the country. The plant receives coal from the Lingaraj coal mine of MCL through a MGR Railway transportation system covering a distance of 39  km.

[edit]

Talcher Coalfield with reserves of 38.65 billion tonnes, the largest in India,[4] is located on the Cuttack–Sambalpur line.[5] This railway line connects the MCL coalfields of Brajrajnagar and Talcher in western and eastern Odisha respectively.

Speed limits

[edit]

The Cuttack–Sambalpur line is classified as a "Group D Spl" line which can take speeds up to 100 km/h. This section already carries high traffic density and is likely to grow substantially in future with the completion of doubling work. The sanctioned speed limit for this line is 100 km/h.[6]

Passenger movement

[edit]

Cuttack, Dhenkanal, Angul, Talcher road and Sambalpur are the busiest railway stations in this section.

References

[edit]
  1. ^ "A saga of performance". Frontline.in. Retrieved 16 December 2017.
  2. ^ "Talcher-Sambalpur" (PDF). Eastcoastrail.indianrailways.gov.in. Retrieved 14 January 2018.
  3. ^ "Sambalpur-Talcher Doubling Project Completed". 23 August 2023.
  4. ^ "Coal Resources of India (As on 1.1.2004)" (PDF). Coal Wing, Geological Survey of India, Kolkata. Archived from the original (PDF) on 27 March 2012. Retrieved 30 November 2012.
  5. ^ "SARAPAL-NUAPARHA, TALCHER COALFIELD" (PDF). Coal.nic.in. Retrieved 14 January 2018.
  6. ^ "Chapter II – The Maintenance of Permanent Way". Indianrailways.gov.in. Retrieved 2 January 2013.